Interior Painting Cost Calculator

Price an interior or exterior painting job from your own rates: paint and primer by the gallon, preparation hours, trim, access and sundries, with the cost per square foot at the end.

A painter pricing a room before starting work
Painting Cost Calculator

Why the Paint Is the Small Half

Enter the areas, the coats, the spread rate off the tin and your own rates, and this works out the gallons to buy, the preparation, the application, the trim and the access, then divides the total by the area painted. The line that decides most painting quotes is the preparation, and it is asked for in hours on purpose: a percentage applied to the paint cost is a guess dressed up as a method. Two honest quotes for the same rooms can differ by a factor of two, and the difference is almost never the paint.

On an interior repaint the preparation hours are usually the line that decides the price. Walk the rooms and count the repairs before you fill that box in.

Your Prices

Every rate is yours. Leave a field blank and that line stays out of the total.

Results

QUANTITIES

Area painted: -
Paint: -
Primer: -

Paint is sold in whole cans, so the figure in brackets is what you buy rather than what goes on the wall.

Step by Step

How to Price a Painting Job

Paint is the small half. On a typical repaint the material is a minority of the invoice and the preparation decides the rest, which is why two honest quotes for the same rooms can differ by a factor of two. Get the gallons out of the area, the coats and the spread rate on the tin. Then price the preparation by the hour against what you actually found on the walk-round, because that is the number that makes or loses the job.

1. Measure the walls, then the ceiling separately

Perimeter times height for the walls, length times width for the ceiling. Keep them apart: ceilings take a different product, more masking and more time under the roller.

2. Subtract the big openings only

Take out doors and large windows. Leaving the small ones in covers the cutting-in around them, which takes longer than rolling the area they occupy.

3. Decide the coats before anything else

The same colour over a sound surface can be one coat. Light over dark, or any strong colour, is a primer plus two. That decision changes the gallons and the hours by more than any other single answer.

4. Take the spread rate off the tin

It is measured on a sealed, smooth surface. New drywall, bare plaster, render and old chalky exterior paint drink the first coat, and heavy texture increases the real surface area well beyond what you measured.

5. Count the preparation in hours

Filling, sanding, caulking, washing, scraping, spot-priming. Walk the rooms and count the repairs rather than applying a percentage. This is the line that separates a quote that pays from one that does not.

6. Price trim by the linear foot

Trim, doors and frames are slow work and they do not belong in a wall rate. A room with panelled doors, deep skirting and a picture rail can take longer than its walls.

7. Add access, sundries and the cans you have to buy whole

Scaffolding or a lift is a hire cost plus a setup day plus a strike day. Sundries are tape, sheets, rollers and disposal. And paint is sold in whole cans, so a job needing 4.2 gallons buys five.

Worked Example

Worked Example: a 12 x 14 Bedroom, Two Coats

9 foot ceilings, one door, one window, walls and ceiling both painted, spread rate taken from the tin at 350 square feet per gallon.

Item Working Result
Wall perimeter(12 + 14) x 252 ft
Gross wall area52 x 9468 sq ft
Openings removeddoor 21 + window 15−36 sq ft
Net wall area468 − 36432 sq ft
Ceiling12 x 14168 sq ft
Total area432 + 168600 sq ft
Paint needed600 x 2 coats ÷ 3503.43 gal
Paint to buywhole cans4 gal
Worked Example

Worked Example: an Exterior Repaint

1,800 square feet of siding in sound but faded condition, one coat over a wash and a scrape, two storeys, trim priced separately.

Item Working Result
Siding areameasured1,800 sq ft
Paint needed1,800 x 1 coat ÷ 3505.14 gal
Paint to buywhole cans6 gal
Spot primingbare wood found on the walk-roundits own hours
Preparationwash, scrape, sand, caulkthe majority of the labour
Accesstwo storeysscaffolding, plus a day up and a day down
Weathera window that can closeschedule risk, not a line item
Reference

What Decides the Number of Coats

Coats multiply both the paint and the hours, so this is the first question to settle.

Situation Coats Note
Same colour, sound surface1A refresh rather than a repaint
Light over light, different colour2The normal case
Light over dark, or a strong colourprimer + 2The primer is what stops the third coat
New drywall or bare plasterprimer + 2The first coat is absorbed, not applied
Stains, smoke or water marksstain-blocking primer + 2Ordinary primer will not hold it back
The Rest of the Job

Where the Hours Actually Go

None of these are paint, and together they are most of the invoice.

Masking and putting back

In an occupied house, covering furniture and floors and then restoring the room every evening is real time that produces nothing visible. An empty house is a different quote.

Repairs before paint

Filling, skimming a badly patched wall, sanding out old brush ridges, caulking gaps at the trim. Count them on the walk-round, because a wall that looks fine from the doorway rarely is.

Cutting in

Edges, corners, ceiling lines and around every fitting. It is slow, it is skilled, and it does not shrink when the room does.

Access

Stairwells, double-height spaces and two-storey exteriors are priced on how you reach them before they are priced on area.

Weather, on the outside

A day lost to rain is a day paid for. Build the risk into the schedule rather than into a lower price.

Watch Out

Where Estimates Go Wrong

Pricing from the square footage alone

Two rooms of the same size in different condition are different jobs. The area sets the paint; the condition sets the hours, and the hours are the bigger number.

Trusting the spread rate on new drywall

The figure on the tin assumes a sealed surface. Unprimed board absorbs the first coat, and a job priced without a primer coat runs out of paint and out of hours at the same time.

Folding trim into the wall rate

Trim is linear-foot work at a slower pace. A house with a lot of it will lose money at a wall rate every time.

Forgetting that paint comes in whole cans

A job needing 4.2 gallons buys five. On a small job that rounding is a noticeable share of the material cost.

Quoting an exterior without a proper look at the substrate

Failed paint, rot and bare wood are found on a ladder, not from the driveway. The scraping and priming they need is the difference between a job that lasts twelve years and one that peels in three.

Questions

Painting Cost — Common Questions

What does interior painting cost?

The paint is the small half of it. The number is set by how many coats the colour change forces, how much filling, sanding and caulking the walls need first, how much trim there is, and whether the house is occupied and has to be masked and restored every day. Price the gallons from the area and the preparation from the walk-round.

How much paint do I need for a room?

Area times coats, divided by the spread rate on the tin, rounded up to whole cans. A 12 by 14 room with 9 foot ceilings and a painted ceiling is about 600 square feet, which at two coats and 350 square feet per gallon is 3.4 gallons, so four cans.

Why is exterior painting more expensive than interior?

Preparation and access. Washing, scraping, sanding back failed paint, spot-priming bare wood and replacing rotten trim is usually the majority of the labour, and anything above ladder height brings scaffolding with a setup day and a strike day. The weather can also stop the job for a week.

Should I charge by the square foot or by the hour?

Quote a fixed price, but build it from hours. A per-square-foot rate hides the preparation, which is the part that varies most between two jobs of the same size, and it is where a painting quote goes wrong.

Does the customer supplying the paint make it cheaper?

It makes your invoice smaller, not the job cheaper, and it moves the risk. If they under-buy or buy the wrong sheen the job stops. Put the quantity and the product in writing before they order.

How do I price a colour change from dark to light?

As a primer plus two coats, not as three coats of the finish. A tinted primer covers in one pass what two coats of finish paint will struggle with, and it is usually cheaper per gallon as well.

What is a fair preparation allowance?

There is not one, which is the point. Walk the rooms, count the repairs and put hours against them. Any percentage applied to the paint cost is a guess dressed up as a method.

More Tools

The Other Calculators

All free, all the same idea: measurements in, quantities out, your own prices on top.

Concrete Calculator

Yardage, bags and cost for a slab, footing or pour, at your own rates, plus what actually drives the price of a concrete job beyond the ready-mix.

Open the calculator →

Paint Calculator

Paint quantities and cost for walls and ceilings separately, in gallons, with coats and coverage accounted for, plus what decides an interior or exterior painting price.

Open the calculator →

Drywall Calculator

Drywall sheets, framing, screws and insulation for a room, by sheet size and waste allowance, plus how drywall repair is priced and why it is not by the square foot.

Open the calculator →

Tile Calculator

Tiles, boxes and grout for a floor or wall, with the waste allowance that saves the second trip, plus what tile installation costs per square foot and why the rate is not one number.

Open the calculator →

Drywall Cost Calculator

Price a drywall job: board, compound, tape, screws, hanging and finishing labor, at your own rates, with the cost per square foot at the end.

Open the calculator →

Concrete Cost Calculator

Price a slab: ready-mix, the short-load fee, gravel base, forms, rebar and finishing labor at your own rates, ending with the cost per square foot.

Open the calculator →

CMU Block Calculator

Blocks, courses, mortar bags and reinforcement for a concrete block wall, with your own prices on top, plus what a block wall costs once the footing and the steel are counted.

Open the calculator →

Brick Calculator

Bricks and mortar for a wall, by brick size and joint thickness, plus what a brick wall costs to build once the footing, the bond and the access are priced.

Open the calculator →

Tile Cost Calculator

Price a tile job: tile, thinset, grout, trim, substrate prep and setting labor at your own rates, with the cost per square foot at the end.

Open the calculator →

Drywall Repair Calculator

Price a drywall repair the way it is actually quoted: by repair type, hours, trips to the house and your minimum callout charge.

Open the calculator →

Drywall Mud Calculator

How much joint compound and tape a job takes, by finish level, converted into the boxes, pails and bags you actually buy.

Open the calculator →

Electrician Calculator

Wire length and cost for a circuit run, by conductor size and material, plus what decides the price of the job: open walls, the number of openings, and what the panel can take.

Open the calculator →
Use It on Your Own Site

Put This Calculator on Your Site

Free to embed, on any site, with no account and nothing to sign. Paste this where you want the tool to appear. It sizes itself to fit, and it keeps working whether or not the visitor ever clicks through to us.

Embed code
<iframe src="https://contractorgetonline.com/embed/calculators/painting-cost"
        data-cgo-calculator
        title="Painting Cost Calculator"
        loading="lazy"
        style="width:100%;min-height:900px;border:0"></iframe>
<p>Free <a href="https://contractorgetonline.com/calculators/painting-cost">Painting Cost Calculator</a> by Contractors Get Online</p>
<script src="https://contractorgetonline.com/embed.js" async></script>

The only thing we ask is that you leave the credit line under it. If you would rather link than embed, a plain link to the calculator page is just as welcome.

Winning the Job Is the Other Half

Estimating gets you the number. Getting asked to quote in the first place is what a website and a Google Business Profile do — live in 72 hours, from $49 a month, set up for your trade.