Concrete Calculator

Calculate the amount of cement, sand, and water needed for your concrete project. Get accurate material calculations and cost estimates based on your mix ratios.

Concrete Calculator calculator
Concrete Calculator

Accurate Concrete Material Calculation

Our concrete calculator helps you determine the exact amount of cement, sand, and water needed for your project based on your mix ratios. Simply enter your dimensions and the ratio of cement, sand, and water. The calculator will provide you with detailed material requirements and cost estimates including material costs and labor fees.

Unit system

Cost Calculation (Optional)

Enter your own supplier prices — we do not guess them for you. Leave a field blank and it is left out of the total.

Results

VOLUME

Total volume: -

MATERIALS

Cement needed: -
Sand needed: -
Water needed: -

Cost Breakdown

Cement: -
Sand: -
Labor: -
Total Cost: -
Step by Step

How to Estimate Concrete for a Slab

Concrete is volume, and the arithmetic that catches people is the unit conversion: multiply length by width by thickness in feet, then divide by 27 to get cubic yards. A 4 inch slab is 0.333 feet thick, not 4. Ready-mix is sold by the cubic yard and bags are sold by volume yield, so the same number answers both. Everything else on this page — the base, the rebar, the second pour you did not plan for — is downstream of getting that one number right.

1. Convert the thickness to feet

4 inches is 4 ÷ 12 = 0.333 ft. 6 inches is 0.5 ft. Doing this first prevents the mistake that ruins the rest.

2. Multiply the three dimensions

Length x width x thickness, all in feet. A 20 x 12 patio at 4 inches is 20 x 12 x 0.333 = 80 cubic feet.

3. Convert to cubic yards

Divide by 27. 80 ÷ 27 = 2.96 cubic yards.

4. Break an odd shape into rectangles

An L-shaped patio or a drive with a turning bay is two or three rectangles, each worked out separately and added. For a circle, use radius squared x 3.14 x thickness. Estimating an irregular slab as one big rectangle overshoots badly, and estimating it as its smallest dimension leaves you mixing bags to finish a truck pour.

5. Add for waste and subgrade

Add 5 to 10%. Ground is never perfectly flat and the low spots take real concrete. That takes 2.96 to about 3.25 cubic yards. On a hand-dug subgrade, or clay that has been rained on, use the top of that range.

6. Decide bags or ready-mix

An 80 lb bag yields about 0.6 cubic feet, so a cubic yard takes 45 bags. Past roughly half a yard, mixing by hand stops making sense — the pour takes longer than the concrete stays workable, and you get a cold joint where one batch met the next.

7. Order in the units your supplier sells

Ready-mix is ordered in cubic yards, usually to the quarter yard, and most plants charge a short-load fee under a full truck. It is worth calling with your yardage before you finalise a quote: the fee for a 3 yard load and for a 9 yard load is the same paperwork, and it changes which jobs are worth combining into one morning.

Worked Example

Worked Example: a 20 x 12 Patio Slab

20 by 12 feet, 4 inches thick, on prepared gravel.

Item Working Result
Thickness in feet4 ÷ 120.333 ft
Volume in cubic feet20 x 12 x 0.33380 cu ft
Cubic yards80 ÷ 272.96 cu yd
With 10% allowance2.96 x 1.103.25 cu yd
If bagged instead80 cu ft ÷ 0.6~134 x 80 lb bags
Worked Example

Worked Example: a 24 x 20 Driveway at 5 Inches

A two-car driveway carrying vehicle weight, so 5 inches rather than 4, with wire mesh and a compacted gravel base. This is the same arithmetic, but the thickness change is where the yardage jumps — and it is the job people underestimate, because they price it off a patio they did last month.

Item Working Result
Thickness in feet5 ÷ 120.417 ft
Volume in cubic feet24 x 20 x 0.417200 cu ft
Cubic yards200 ÷ 277.41 cu yd
With 10% allowance7.41 x 1.108.15 → order 8.25 cu yd
Same slab at 4 inches24 x 20 x 0.333 ÷ 275.93 cu yd
What the extra inch costs7.41 − 5.931.48 cu yd, a quarter more concrete
Gravel base, 4 inches24 x 20 x 0.333 ÷ 275.93 cu yd of aggregate
Reference

Bag Yields and Slab Thicknesses

Item Figure Note
80 lb bag~0.60 cu ft45 bags to the cubic yard.
60 lb bag~0.45 cu ft60 bags to the cubic yard.
40 lb bag~0.30 cu ft90 bags to the cubic yard. Repairs only.
4 inch slab0.333 ftPatios, walkways, shed bases.
5–6 inch slab0.417–0.5 ftDriveways and anything carrying vehicles.
1 cubic yard27 cu ftCovers 81 sq ft at 4 inches thick.
1 cubic yard at 5 inCovers 65 sq ft.
1 cubic yard at 6 inCovers 54 sq ft.
Ready-mix ordering unitCubic yardsUsually to the quarter yard, with a short-load fee under a full truck.
Reference

Concrete for Common Slab Sizes

The sizes that come up over and over, worked out both ways. Yardage includes no waste allowance — add 5 to 10% to what you order. Bag counts are 80 lb bags at 0.6 cubic feet each, rounded up.

Slab At 4 inches At 6 inches As 80 lb bags (4 in)
4 x 4 pad (16 sq ft)0.20 cu yd0.30 cu yd9 bags
8 x 8 (64 sq ft)0.79 cu yd1.19 cu yd36 bags
10 x 10 (100 sq ft)1.23 cu yd1.85 cu yd56 bags
10 x 20 (200 sq ft)2.47 cu yd3.70 cu yd112 bags
12 x 12 (144 sq ft)1.78 cu yd2.67 cu yd80 bags
16 x 20 (320 sq ft)3.95 cu yd5.93 cu yd178 bags
20 x 20 (400 sq ft)4.94 cu yd7.41 cu yd223 bags
24 x 24 (576 sq ft)7.11 cu yd10.67 cu yd320 bags
30 x 40 shop floor (1,200 sq ft)14.81 cu yd22.22 cu ydTruck territory
What It Costs

What a Concrete Slab Costs to Pour

The ready-mix is the line everyone prices first, and on a residential slab it is rarely the majority of the invoice. Concrete is sold by the cubic yard delivered, so the calculator above gives you the biggest single number in one step. Then comes everything that has to happen before and after the truck arrives: the excavation, the gravel, the forms, the steel, the placing crew and the finishing. On a small pour with a pump and a stamped finish the concrete itself can be under half the total, which is why a cost per square foot copied off a national average tells you almost nothing about the job in front of you.

Yardage, and the short-load fee underneath it

Ready-mix is priced per cubic yard delivered, with a short-load surcharge below the supplier's minimum. That fee is why two 3-yard pours on separate days cost noticeably more than one 6-yard pour, and why it is worth combining a slab with the footing or the walkway when the schedule allows. The threshold and the surcharge are printed on your supplier's price sheet. Ask for both before you quote.

What is under the slab

Excavation depth, the compacted gravel base, the vapour barrier and hauling the spoil away are a full line of their own, and on a sloping or clay site they can rival the concrete. This is also the line that gets cut to win a job and cracks the slab two winters later.

Thickness, which is a volume decision and not a surface one

Going from 4 to 5 inches on a 400 square foot slab is not a small percentage of a small number, it is over a cubic yard and a half of extra concrete. A driveway carrying vehicles needs the thickness. A shed base does not.

Reinforcement

Welded mesh, a rebar grid at a stated spacing, or fibre in the mix are three different prices and three different labour times. A rebar grid also needs chairs and tying time, which is hours rather than materials.

How the concrete gets from the truck to the form

A chute reaches roughly the length of the truck. Past that it is wheelbarrows, a buggy or a pump, and a pump is a fixed cost with a minimum charge that lands on a small job as hard as on a big one. Back-garden access with no truck route is the most commonly underquoted item on a residential pour.

The finish

A broom finish is one pass. Power-trowelled, exposed aggregate, coloured or stamped work is finishing labour that scales with the surface area rather than the volume, and stamped work brings release agent, sealer and a second visit.

Weather

Hot-weather retarders, cold-weather accelerators, blankets and a cancelled pour are all real costs. On a driveway the curing window also decides when the customer can park on it, which is a scheduling promise worth making carefully.

What It Costs

Where the Money Goes on a Concrete Job

Price each of these separately with your own suppliers and rates. The point of the list is that only the first line comes out of a yardage calculation.

Line item What drives it What gets missed
Ready-mix deliveredCubic yards x delivered price per yard, plus any short-load feeOrdering the exact calculated yards. A slab that runs 3% over means a second truck or a cold joint.
Excavation and baseDepth, soil type, gravel thickness, compaction passes, spoil removalHaulage of the spoil, and the day the digger cannot get in.
FormsLinear feet of edge, plus stakes, ties and release agentSteps, curves and thickened edges add edge without adding square footage.
ReinforcementMesh, bar size and grid spacing, chairs, tying hoursChairs and tie wire are cheap. The hours to place a grid are not.
PlacingCrew size x hours, plus a pump or buggy where the chute does not reachThe pump minimum charge on a small pour.
FinishingSurface square footage and the finish specifiedStamped and coloured work needs a return visit for sealer.
Joints and curingSaw cuts per linear foot, curing compound or blankets per square footCutting control joints late is what produces the random crack the customer calls about.
CleanupWashout, waste concrete disposal, protecting what is next to the pourThere is no legal free place to wash out a truck.
The Rest of the Job

What Goes Under and Inside the Slab

The concrete is usually the smaller part of the estimate. These are the items that sit either side of it, and the ones a homeowner never thinks to ask about until the slab has already cracked.

The gravel base is its own volume

Four inches of compacted crushed stone under a slab is the same arithmetic as the concrete — length x width x 0.333 ÷ 27 — and it has to be quoted and hauled. On a 24 x 20 driveway that is another 5.93 cubic yards of aggregate. Aggregate is sold by the ton in most yards rather than the yard, so ask your supplier what a yard of their base material weighs before you convert.

Compaction is what stops the cracking

A base that has not been compacted in lifts settles unevenly, and an unsupported slab cracks wherever the void ended up. This is invisible in the finished job and it is the single most common cause of a callback two winters later.

Rebar or mesh, and how much

Wire mesh in a residential slab, rebar on a grid where there is vehicle load or a footing. Rebar quantity is linear feet: divide the slab length by the spacing for the number of bars in each direction, then add the laps. At 18 inch centres a 20 x 12 slab takes roughly 9 bars one way and 14 the other.

Control joints are planned, not hoped for

Concrete cracks; joints decide where. The usual guide is joints no further apart than 24 to 30 times the slab thickness — on a 4 inch slab that is 8 to 10 feet — and panels kept roughly square rather than long and thin.

Curing time versus load time

Foot traffic in a day or so, furniture in a few days, vehicles at 7 days at the earliest and comfortably at 28, which is when the design strength is measured. Telling a customer this up front prevents the phone call where a truck has been parked on a four-day-old driveway.

Weather changes the order

Heat shortens working time, so a big pour on a hot day wants either an earlier start or an admixture. Cold slows the set and freezing ruins it. Neither changes the yardage — both change whether the yardage arrives in one load or two.

Watch Out

Where Estimates Go Wrong

Using inches where the formula wants feet

Putting 4 in instead of 0.333 overstates the pour twelvefold. It is the single most common concrete estimating error.

Ordering the exact calculated amount

Subgrade is never level. Running short mid-pour means a cold joint through the middle of a slab that should have been monolithic.

Bagging a job that wanted a truck

Past about half a yard the mixing time, the water and the consistency all work against you, and the slab shows it.

Quoting the concrete and forgetting the base

Aggregate, hauling, forms, mesh and the labour to compact are frequently more than the ready-mix itself. An estimate built only from yardage looks competitive right up to the point where it is unprofitable.

Adding water at the truck to make it easier to place

Every gallon added past the mix design costs strength and adds shrinkage cracking. If it is going to be a hard placement, that is a decision for the mix and the timing, not for the chute.

Pricing a driveway off a patio

The extra inch or two of thickness is not a rounding difference — the same footprint at 5 inches instead of 4 takes a quarter more concrete, and it usually adds rebar and a deeper base as well.

Questions

Concrete Calculator — Common Questions

What does a concrete slab cost?

Take the yardage from the calculator above, multiply it by your supplier's delivered price per cubic yard, and you have the largest single line. Then price the excavation and gravel base, the forms, the reinforcement, the placing crew and the finishing separately, because on a small residential slab those together often exceed the concrete. Watch two items in particular: the short-load fee below your supplier's minimum, and a pump where the truck chute cannot reach the forms.

How many cubic yards of concrete do I need for a 20x12 patio?

At 4 inches thick, 2.96 cubic yards before waste — call it 3.25 ordered. At 6 inches it is 4.44 before waste.

How much concrete do I need for a 10x10 slab?

1.23 cubic yards at 4 inches thick, or about 56 x 80 lb bags. At 6 inches it is 1.85 cubic yards. Add 5 to 10% to whatever you order.

How many 80 lb bags of concrete are in a cubic yard?

About 45. Each 80 lb bag yields roughly 0.6 cubic feet and there are 27 cubic feet in a yard.

How thick should a concrete slab be?

4 inches for patios, walkways and shed bases. 5 to 6 inches for driveways or anything taking vehicle weight.

How much does a cubic yard of concrete cover?

81 square feet at 4 inches thick, 65 at 5 inches, 54 at 6 inches.

Should I use bags or order a ready-mix truck?

Bags up to about half a cubic yard — a small pad, a set of post bases, a repair. Past that the mixing cannot keep pace with the placing, and you end up with cold joints between batches. A truck also gives you a consistent mix design, which bags mixed by eye on site do not.

Do I need rebar in a concrete slab?

Wire mesh is normal in a residential slab and rebar goes in where there is vehicle load, a footing, or a slab thicker than about 5 inches. Neither prevents cracking — the base does that. What steel does is hold the two sides of a crack together so it stays a hairline instead of becoming a trip hazard.

How long before you can drive on a new concrete driveway?

A week at the very earliest for a car, and 28 days is when concrete is measured at its design strength. Heavy vehicles and dumpsters should wait for the full cure. This is worth putting in writing on the estimate, because the damage from an early load is not repairable.

How do I turn cubic yards into a price for the customer?

Take your yardage, add the waste allowance, and multiply by your supplier's current per-yard price — then add the short-load fee if you are under a full truck, the base material, the forms, the steel and your labour hours. The calculator above asks for your own rates rather than assuming a national average, because the yard price you are quoted this month is the only one that matters to your margin.

More Tools

The Other Calculators

All free, all the same idea: measurements in, quantities out, your own prices on top.

Paint Calculator

Paint quantities and cost for walls and ceilings separately, in gallons, with coats and coverage accounted for, plus what decides an interior or exterior painting price.

Open the calculator →

Drywall Calculator

Drywall sheets, framing, screws and insulation for a room, by sheet size and waste allowance, plus how drywall repair is priced and why it is not by the square foot.

Open the calculator →

Tile Calculator

Tiles, boxes and grout for a floor or wall, with the waste allowance that saves the second trip, plus what tile installation costs per square foot and why the rate is not one number.

Open the calculator →

Drywall Cost Calculator

Price a drywall job: board, compound, tape, screws, hanging and finishing labor, at your own rates, with the cost per square foot at the end.

Open the calculator →

Concrete Cost Calculator

Price a slab: ready-mix, the short-load fee, gravel base, forms, rebar and finishing labor at your own rates, ending with the cost per square foot.

Open the calculator →

CMU Block Calculator

Blocks, courses, mortar bags and reinforcement for a concrete block wall, with your own prices on top, plus what a block wall costs once the footing and the steel are counted.

Open the calculator →

Brick Calculator

Bricks and mortar for a wall, by brick size and joint thickness, plus what a brick wall costs to build once the footing, the bond and the access are priced.

Open the calculator →

Tile Cost Calculator

Price a tile job: tile, thinset, grout, trim, substrate prep and setting labor at your own rates, with the cost per square foot at the end.

Open the calculator →

Painting Cost Calculator

Price a painting job: paint, primer, preparation hours, trim, access and sundries at your own rates, interior or exterior, per square foot.

Open the calculator →

Drywall Repair Calculator

Price a drywall repair the way it is actually quoted: by repair type, hours, trips to the house and your minimum callout charge.

Open the calculator →

Drywall Mud Calculator

How much joint compound and tape a job takes, by finish level, converted into the boxes, pails and bags you actually buy.

Open the calculator →

Electrician Calculator

Wire length and cost for a circuit run, by conductor size and material, plus what decides the price of the job: open walls, the number of openings, and what the panel can take.

Open the calculator →
Use It on Your Own Site

Put This Calculator on Your Site

Free to embed, on any site, with no account and nothing to sign. Paste this where you want the tool to appear. It sizes itself to fit, and it keeps working whether or not the visitor ever clicks through to us.

Embed code
<iframe src="https://contractorgetonline.com/embed/calculators/concrete"
        data-cgo-calculator
        title="Concrete Calculator"
        loading="lazy"
        style="width:100%;min-height:900px;border:0"></iframe>
<p>Free <a href="https://contractorgetonline.com/calculators/concrete">Concrete Calculator</a> by Contractors Get Online</p>
<script src="https://contractorgetonline.com/embed.js" async></script>

The only thing we ask is that you leave the credit line under it. If you would rather link than embed, a plain link to the calculator page is just as welcome.