CMU Block Calculator

Blocks, Courses and Steel for a Block Wall

A standard block is nominally 8 by 8 by 16 inches, so its face covers 0.888 square feet and 100 square feet of wall takes 112.5 blocks. Enter the wall length and height, take out the openings, and this gives you the block count, the number of courses, the blocks in each course, the mortar bags and the reinforcement — vertical bar at your chosen spacing and joint wire in every other course. Prices are yours to enter. Core fill grout is deliberately left out: the void volume is printed on your block supplier's data sheet and it differs between units, and on a reinforced wall that is the last item worth guessing at.

Your Prices

Block and mortar prices move with the yard and the season, so these are yours to enter. Leave a field blank and it stays out of the total.

Results

THE WALL

Net wall area: -
Blocks: -
Courses: -
Blocks per course: -
Mortar: -
Vertical rebar: -
Joint reinforcement: -

Core fill grout is deliberately not calculated here: the void volume differs between two-core and three-core units and between manufacturers, and it is printed on the unit's own data sheet. On a reinforced wall that is the most expensive single item, so it is worth reading rather than guessing.

Cost Breakdown

Block: -
Mortar: -
Rebar: -
Joint reinforcement: -
Materials subtotal: -
Labor: -
Total: -
Cost per square foot: -
Step by Step

How to Estimate a Concrete Block Wall

A standard concrete block is nominally 8 by 8 by 16 inches, so its face covers 8/9 of a square foot — which is why the number every mason knows is 112.5 blocks per 100 square feet of wall. Everything else follows from the courses: the wall height divided by 8 inches gives you the number of courses, and there is no cutting a course in half the way you would rip a sheet. The calculator above does the blocks, the courses, the mortar and the steel; what it will not do is guess the grout for filling the cores, because that number is printed on your block supplier's data sheet and it differs between units.

1. Get the net wall area

Length times height, then take out the doors, windows and any opening you are not laying through. Unlike drywall, subtract every opening — a block you do not lay is a block you do not buy, and the offcut from a cut block is rarely usable elsewhere.

2. Multiply by 1.125 for the block count

A nominal 8 x 16 face with its mortar joint covers 0.888 square feet, so a square foot takes 1.125 blocks and 100 square feet takes 112.5. A 40 by 8 foot wall is 320 square feet, so 360 blocks before waste.

3. Work out the courses, and check they come out whole

Each course is 8 inches with its joint, so the wall height in inches divided by 8 is the course count. An 8 foot wall is 12 courses exactly. A wall height that does not divide by 8 means either a cut course or a change to the design, and it is much cheaper to find that out now.

4. Work out the blocks per course

The wall length in inches divided by 16. This is what tells you whether the corners and openings land on a joint or in the middle of a block, which is where the cutting time comes from.

5. Add waste — less than you would for brick

5% is normal on a straightforward wall. Block is big and regular, there is less breakage than with brick, and most of the loss is at corners and openings rather than in cutting.

6. Add the mortar by the bag

Around three 70 lb bags of mortar mix per 100 blocks laid. If you are mixing masonry cement with sand rather than buying pre-blended mix, that also brings in the sand, which is sold by the ton and is worth pricing separately.

7. Add the steel the wall actually needs

Vertical bar in the cores at the spacing your design or code calls for, running the full height plus a lap into the footing. Horizontal joint reinforcement — ladder or truss wire — in every other course is the usual residential practice, sold in 10 foot lengths and lapped, so allow for the overlap.

8. Get the grout figure from the block, not from a rule of thumb

If the cores are being filled, look up the void volume for the exact unit you are buying. Two-core and three-core blocks differ, and lightweight units differ again. On a reinforced wall the grout is often the biggest single material line, which is exactly why it should not be estimated from a number found on the internet.

Worked Example

Worked Example: a 40 x 8 ft Garden Wall

40 feet long, 8 feet high, no openings, standard 8 x 8 x 16 block, 5% waste, no vertical bar, joint wire every other course.

Item Working Result
Wall area40 x 8320 sq ft
With 5% waste320 x 1.05336 sq ft
Blocks336 x 1.125378 blocks
Courses8 ft x 12 ÷ 8 in12 courses
Blocks per course40 ft x 12 ÷ 16 in30 per course
Check30 x 12360 laid, plus the waste allowance
Mortar378 ÷ 100 x 3 bags12 x 70 lb bags
Joint wire6 courses x 40 ft, plus lap26 x 10 ft pieces
Worked Example

Worked Example: a Reinforced Foundation Wall

The same 40 by 8 foot wall, but structural: vertical bar at 32 inch centres and all cores filled. This is where a block estimate stops resembling a brick one.

Item Working Result
BlocksAs above378 blocks
Vertical bars40 ft x 12 ÷ 32 in, plus one16 bars
Bar length each8 ft wall + 1 ft lap9 ft
Total bar16 x 9144 linear ft
Bond beamTop course, full length40 ft plus laps
Core fill groutVoid volume x cores filledFrom the unit data sheet
Extra laborPlacing steel, grouting, vibratingA separate line, not a rate on area
Reference

Block Sizes and the Numbers That Follow

Nominal dimensions include the mortar joint; actual block is 3/8 inch smaller in each direction. Estimate on nominal, cut on actual.

Unit Face coverage Blocks per 100 sq ft
8 x 8 x 16 standard0.888 sq ft112.5
4 x 8 x 16 (4 in thick)0.888 sq ft112.5 (same face, thinner wall)
12 x 8 x 160.888 sq ft112.5 (same face, 12 in thick)
8 x 4 x 16 half-high0.444 sq ft225
Course height8 in nominal1.5 courses per foot of height
Blocks per foot of length0.75One block every 16 in
Mortar3 x 70 lb bags per 100 blocksPre-blended mix.
Joint wireEvery other course10 ft lengths, lapped.
What It Costs

What a Block Wall Costs to Build

Block and mortar come straight out of the calculator above. What sits around them is the footing, the steel and the lifting, and on a retaining or load-bearing wall those three are most of the price. A dry-stack garden wall and an engineered retaining wall of the same length are different jobs with the same block count.

The footing

A block wall needs a designed footing, and a retaining wall needs reinforcement tied from that footing into the wall itself. Excavation, concrete and steel below ground regularly cost more than the visible wall above.

Reinforcement and grouting

Vertical bar in grouted cells, horizontal joint reinforcement and bond beams all add material and slow the laying. Core-fill grout is deliberately left out of the calculator because void volume varies by unit and belongs on the manufacturer's data sheet, but it is a real and substantial cost on any reinforced wall.

Block weight

A standard 8-inch block is heavy enough that a day of laying is limited by the labourer as much as by the mason. Where the pallets land on delivery matters: blocks stacked forty feet from the wall get handled twice.

Drainage on anything holding back ground

Gravel backfill, filter fabric and a drain line behind a retaining wall are not optional and they are not visible in the finished job. Leaving them out is how a wall ends up leaning.

The finish

Bare block, painted, rendered or faced with stone are four very different prices for the same structure, and the finish decides how much care the blockwork itself needs.

What It Costs

The Lines Behind a Block Wall Price

Line item What drives it
BlockBlock count from wall area and unit size, plus breakage
FootingExcavation, concrete, reinforcement, spoil removal
MortarBags and sand from the block count and joint size
Steel and groutVertical bar spacing, bond beams, joint reinforcement, cells filled
Drainage and backfillGravel, fabric and a drain line on any retaining wall
Laying labourBlocks per day, adjusted for height, corners and openings
Access and liftingWhere the blocks land on delivery, and any platform above waist height
FinishPaint, render or facing, priced per square foot of face
The Rest of the Job

What Decides Whether a Block Wall Job Pays

The block count is the easy part and it is rarely where a block job goes wrong. These are the items that move the number.

The footing is a separate estimate

A block wall sits on a poured footing, and that is concrete by the cubic yard plus its own steel and forms. Quoting the wall without the footing is the most common omission on this kind of job.

Corners and openings are where the hours go

A long straight run goes up fast. Corners have to be built and levelled first, and openings need lintels or bond beams. Two walls with the same square footage and different corner counts are not the same job.

Whether the wall is seen

A foundation wall that gets backfilled is not finished to the same standard as a garden wall someone will look at every day. Struck joints, consistent colour and clean faces are real time, and worth pricing separately from the laying.

Getting the block to the wall

A standard block is heavy and there are hundreds of them. Delivery placement, a pallet that can be reached, and whether they have to be carried through a garden all matter more on block than on almost any other material.

Weather and lift heights

Mortar does not want to be laid in freezing weather, and you cannot build a full-height wall in one day without the lower courses taking the load. Both affect scheduling rather than materials, and both belong in the price.

Cleaning and sealing

Efflorescence, mortar smears and the decision to seal or paint are all after the wall is up. They are the parts a customer notices, and the parts most often left out of the quote.

Watch Out

Where Estimates Go Wrong

Estimating block off brick figures

Brick and block are counted, coursed and mortared differently. A brick figure applied to block gives a number that is wrong in both directions at once.

Designing a wall height that does not divide by 8 inches

Every course is 8 inches. A height that does not come out whole means cutting a course along its length, which is slow, looks wrong and weakens the bond.

Guessing the core fill grout

Void volume varies by unit and manufacturer, and on a reinforced wall grout can be the largest material line. It is published — read it.

Leaving the footing out of the quote

The concrete, the steel, the forms and the excavation for the footing are frequently more than the block wall standing on top of it.

Forgetting the horizontal wire

Individually cheap, and it goes into half the courses across the entire wall. Missing it from the estimate is a small error repeated a lot of times.

Adding brick-sized waste

10 to 15% is a brick allowance. Block is bigger, more regular and breaks less; 5% is usually right, and over-ordering block means paying to store and return pallets.

Questions

CMU Block — Common Questions

What does a block wall cost?

Block and mortar come from the calculator above. The footing, the reinforcement and the grout usually cost more than the visible wall, and on anything holding back ground the gravel backfill and drain line behind it are part of the job rather than an extra. Bare, painted, rendered or stone-faced are four different prices for the same structure.

How many concrete blocks do I need per 100 square feet?

112.5 standard 8 x 8 x 16 blocks. The nominal face including its mortar joint covers 0.888 square feet, so each square foot takes 1.125 blocks.

How many blocks are in a course?

The wall length in inches divided by 16. A 40 foot wall is 480 inches, so 30 blocks per course. Height works the same way with 8 inch courses: an 8 foot wall is 12 courses.

How much mortar do I need for concrete block?

Around three 70 lb bags of pre-blended mortar mix per 100 blocks laid. If you are mixing masonry cement with sand instead, price the sand separately — it is sold by the ton and it is easy to leave out.

How much waste should I allow on block?

About 5% on a straightforward wall, less than you would allow for brick. Block is larger, more uniform and breaks less, and most of the loss happens at corners and openings.

How much grout do I need to fill the cores?

Look it up for the exact block you are buying rather than using a general figure. Void volume differs between two-core and three-core units and between manufacturers, and on a reinforced wall the grout is often the biggest single material cost — which is the worst place to be approximate.

What is the actual size of an 8 inch block?

7 5/8 by 7 5/8 by 15 5/8 inches. The nominal 8 x 8 x 16 includes a 3/8 inch mortar joint, which is why the estimating arithmetic works on nominal sizes and the cutting works on actual ones.

Do I need rebar in a block wall?

A structural wall does, and the spacing comes from the design or the local code rather than from a rule of thumb. A low garden wall may need none. Where bar is used it runs the full height with a lap into the footing, and those cores get grouted.

More Tools

The Other Calculators

All free, all the same idea: measurements in, quantities out, your own prices on top.

Concrete Calculator

Yardage, bags and cost for a slab, footing or pour, at your own rates, plus what actually drives the price of a concrete job beyond the ready-mix.

Open the calculator →

Paint Calculator

Paint quantities and cost for walls and ceilings separately, in gallons, with coats and coverage accounted for, plus what decides an interior or exterior painting price.

Open the calculator →

Drywall Calculator

Drywall sheets, framing, screws and insulation for a room, by sheet size and waste allowance, plus how drywall repair is priced and why it is not by the square foot.

Open the calculator →

Tile Calculator

Tiles, boxes and grout for a floor or wall, with the waste allowance that saves the second trip, plus what tile installation costs per square foot and why the rate is not one number.

Open the calculator →

Drywall Cost Calculator

Price a drywall job: board, compound, tape, screws, hanging and finishing labor, at your own rates, with the cost per square foot at the end.

Open the calculator →

Concrete Cost Calculator

Price a slab: ready-mix, the short-load fee, gravel base, forms, rebar and finishing labor at your own rates, ending with the cost per square foot.

Open the calculator →

Brick Calculator

Bricks and mortar for a wall, by brick size and joint thickness, plus what a brick wall costs to build once the footing, the bond and the access are priced.

Open the calculator →

Tile Cost Calculator

Price a tile job: tile, thinset, grout, trim, substrate prep and setting labor at your own rates, with the cost per square foot at the end.

Open the calculator →

Painting Cost Calculator

Price a painting job: paint, primer, preparation hours, trim, access and sundries at your own rates, interior or exterior, per square foot.

Open the calculator →

Drywall Repair Calculator

Price a drywall repair the way it is actually quoted: by repair type, hours, trips to the house and your minimum callout charge.

Open the calculator →

Drywall Mud Calculator

How much joint compound and tape a job takes, by finish level, converted into the boxes, pails and bags you actually buy.

Open the calculator →

Electrician Calculator

Wire length and cost for a circuit run, by conductor size and material, plus what decides the price of the job: open walls, the number of openings, and what the panel can take.

Open the calculator →
Use It on Your Own Site

Put This Calculator on Your Site

Free to embed, on any site, with no account and nothing to sign. Paste this where you want the tool to appear. It sizes itself to fit, and it keeps working whether or not the visitor ever clicks through to us.

Embed code
<iframe src="https://contractorgetonline.com/embed/calculators/cmu-block"
        data-cgo-calculator
        title="CMU Block Calculator"
        loading="lazy"
        style="width:100%;min-height:900px;border:0"></iframe>
<p>Free <a href="https://contractorgetonline.com/calculators/cmu-block">CMU Block Calculator</a> by Contractors Get Online</p>
<script src="https://contractorgetonline.com/embed.js" async></script>

The only thing we ask is that you leave the credit line under it. If you would rather link than embed, a plain link to the calculator page is just as welcome.

Winning the Job Is the Other Half

Estimating gets you the number. Getting asked to quote in the first place is what a website and a Google Business Profile do — live in 72 hours, from $49 a month, set up for your trade.