Concrete Slab Cost Calculator

Price a concrete slab from your own rates: ready-mix and the short-load fee, the gravel base, forms, reinforcement, placing and finishing, ending with the cost per square foot.

A contractor pricing a concrete slab before a pour
Concrete Cost Calculator

What a Concrete Slab Actually Costs to Pour

Enter the slab dimensions and your own rates and this works out the yardage to order, the gravel underneath, the form perimeter and the rebar in the grid, then puts your prices on all of it and divides by the area. What it will not print is a national average cost per square foot. That figure blends regions, thicknesses, finishes and new work against replacement, and quoting it to a customer means quoting somebody else’s costs. Watch two lines in particular: the short-load fee below your supplier’s minimum, and a pump where the truck chute will not reach the forms.

Your Prices

Every rate here is yours. Leave a field blank and that line stays out of the total, so you can price the concrete on its own or the whole pour.

Results

QUANTITIES

Slab area: -
Concrete, measured: -
Concrete, to order: -
Gravel base: -
Rebar: -
Form perimeter: -

Step by Step

How to Price a Concrete Slab

A concrete slab costs the ready-mix, plus what you do to the ground under it, plus the forms and the steel, plus getting the concrete from the truck into the forms and finishing it. Work out the cubic yards first, because that is the one line that comes straight out of the dimensions. Then price the rest separately, because on a small residential pour the concrete is often under half the invoice and a cost per square foot copied off a national average is somebody else’s job, not yours.

1. Get the cubic yards

Length times width times thickness in feet, divided by 27. A 20 by 20 slab at 4 inches is 400 x 0.333 = 133 cubic feet, which is 4.94 cubic yards. The calculator does it, but knowing the arithmetic is how you sanity-check any number a supplier or a tool gives you.

2. Add the over-order allowance

Ten per cent is the usual figure. Sub-grade is never perfectly flat and the truck cannot bring you the last quarter yard later: running short means a cold joint or a second delivery, both of which cost more than the extra concrete.

3. Check the short-load threshold before you quote

Suppliers charge a surcharge below a minimum load. Both the threshold and the fee are on their price sheet. This is the item that makes two small pours on separate days cost noticeably more than one larger pour, and it is worth combining a slab with a footing or a walkway when the schedule allows.

4. Price what goes underneath

Excavation depth, the compacted gravel base, the vapour barrier and hauling the spoil away. Gravel is the same arithmetic as the concrete: area times base thickness in feet, divided by 27. On a sloping or clay site this line can rival the concrete itself.

5. Price the forms and the steel

Forms are priced along the perimeter, so a slab with steps, curves or a thickened edge carries more form per square foot than a plain rectangle. For a rebar grid, count bars in both directions: the number of bars in each direction is one more than the number of gaps, which is the step people drop.

6. Add placing, finishing and access

Placing and finishing are labour against the surface area. Access is separate: a chute reaches roughly the length of the truck, and past that you are into buggies or a pump, and a pump carries a minimum charge that lands on a small job as hard as on a big one.

7. Divide by the area last

The cost per square foot is an output, not an input. It is the number you compare against your own past jobs to see whether this one is priced like they were.

Worked Example

Worked Example: a 20 x 20 Patio Slab

20 by 20 feet, 4 inches thick, 4 inch compacted gravel base, rebar grid at 16 inches both ways, 10% over-order. Quantities only — put your own rates against them.

Item Working Result
Slab area20 x 20400 sq ft
Concrete, measured400 x (4 ÷ 12) ÷ 274.94 cu yd
Concrete, to order4.94 x 1.105.43 cu yd
Gravel base400 x (4 ÷ 12) ÷ 274.94 cu yd
Form perimeter(20 + 20) x 280 linear ft
Rebar, one directionfloor(20 ÷ 1.33) + 1 = 16 bars x 20 ft320 ft
Rebar, both directions320 x 2640 linear ft
Short-load check5.43 cu yd against your supplier’s minimumusually under it
Worked Example

Worked Example: a 24 x 24 Driveway Slab

Same method, a job that carries vehicles: 5 inches thick, 6 inch base, rebar at 18 inches, and no truck access to the back of the pour.

Item Working Result
Slab area24 x 24576 sq ft
Concrete, measured576 x (5 ÷ 12) ÷ 278.89 cu yd
Concrete, to order8.89 x 1.109.78 cu yd
Gravel base576 x (6 ÷ 12) ÷ 2710.67 cu yd
Form perimeter(24 + 24) x 296 linear ft
Rebar, both directions17 bars x 24 ft, both ways816 linear ft
Placementchute will not reachpump, at its minimum charge
Reference

Cubic Yards per 100 Square Feet

Multiply by your slab area in hundreds of square feet. This is the whole of the concrete arithmetic in one line.

Thickness Cubic yards per 100 sq ft Typical use
4 in1.23Patios, shed bases, walkways, interior slabs
5 in1.54Driveways and anything carrying a vehicle
6 in1.85Heavier loads, garage and workshop floors
8 in2.47Structural slabs and heavy equipment bases
Reference

Common Slab Sizes at 4 Inches

Measured volume before any over-order allowance.

Slab Area Concrete
10 x 10 ft100 sq ft1.23 cu yd
12 x 12 ft144 sq ft1.78 cu yd
16 x 20 ft320 sq ft3.95 cu yd
20 x 20 ft400 sq ft4.94 cu yd
24 x 24 ft576 sq ft7.11 cu yd
30 x 40 ft1,200 sq ft14.81 cu yd
The Rest of the Job

The Lines That Decide Whether the Job Pays

None of these come out of the yardage, and all of them come out of your margin when they are left off the quote.

Excavation and spoil

Digging is only half of it. The soil has to go somewhere, and on a suburban plot with no room for a pile that means a trailer or a skip and the trips to empty it.

Access to the forms

Work out the truck route before you price the pour, not on the morning. A back garden with a side gate is a wheelbarrow job or a pump job, and the difference between those two is most of a day.

Control joints

Cut them early and to about a quarter of the slab depth. Cutting late is what produces the random crack the customer calls you about, and that call is unpaid work on a job you already closed.

Curing and the weather

Blankets in the cold, retarder and covering in the heat, and a pour that gets cancelled because of rain still costs you the day. On a driveway the cure also decides when the customer can park, which is a promise worth making carefully.

Washout

There is no legal free place to wash out a truck or a mixer. Somebody pays for it and it should be in the quote.

Watch Out

Where Estimates Go Wrong

Ordering exactly the calculated yardage

Sub-grade is never dead flat, and a slab that comes out 3% over the calculation leaves you short at the far end. A short pour finishes as a cold joint or waits for a second truck at a second delivery charge.

Forgetting the short-load fee on a small pour

Below the supplier’s minimum load the surcharge can be a large fraction of a small order. Quoting a two-yard pour at the per-yard rate is how that job loses money.

Pricing the pump as an afterthought

A pump has a minimum charge whether you use half an hour of it or a full day. On a small back-garden slab it can be one of the largest single lines, and it has to be decided before the quote goes out.

Treating the gravel base as optional

It is the cheapest insurance on the job and the first thing cut to win a bid. A slab poured on unprepared ground is a callback with your name on it two winters later.

Quoting a national cost per square foot

That figure blends regions, thicknesses, finishes, new work and replacement. Your own cost per square foot, out of your own rates, is the only one that describes the job you are about to do.

Questions

Concrete Slab Cost — Common Questions

How much does a concrete slab cost?

It is the ready-mix plus the base, the forms, the steel, the placing and the finishing, and on a small residential slab those together often exceed the concrete. Take the yardage from the calculator, put your supplier’s delivered price against it, then add each of the other lines separately. Two items catch people out: the short-load fee below your supplier’s minimum, and a pump where the chute cannot reach the forms.

How many cubic yards is a 20x20 slab?

At 4 inches thick, 4.94 cubic yards before any over-order allowance, or about 5.4 yards ordered at the usual 10%. The arithmetic is 400 square feet times a third of a foot, divided by 27.

What does a concrete driveway cost to pour?

The same lines as any slab, with three differences that raise it: the thickness goes to 5 or 6 inches because it carries vehicles, the base is deeper, and the reinforcement is usually a rebar grid rather than fibre or mesh. Access is often easier on a driveway than on a back-garden patio, which pulls the other way.

Should I include the gravel base in the quote?

Yes, as its own line. Showing it separately makes it much harder for a customer to compare your quote against one that quietly leaves it out, and it gives you something to point at when they ask why yours is higher.

How much rebar does a slab need?

That is an engineering question for anything structural or retaining. For the quantity at a given grid spacing, the calculator counts bars in both directions and remembers that each direction has one more bar than it has gaps.

Is a short-load fee negotiable?

Sometimes, and it is worth asking, but plan as if it is not. The reliable way around it is to combine pours so the order clears the supplier’s minimum in one delivery.

Why does the tool not show me an average price per yard?

Because a delivered yard costs different money in different markets and different months, and a figure printed here would be stale within a season. Your supplier’s current price sheet is a phone call away and it is the only correct number for your quote.

What is a reasonable over-order allowance?

Ten per cent on a straightforward rectangular slab. Go higher where the sub-grade is rough, where the forms are complicated, or where a second delivery would be genuinely difficult to arrange.

More Tools

The Other Calculators

All free, all the same idea: measurements in, quantities out, your own prices on top.

Concrete Calculator

Yardage, bags and cost for a slab, footing or pour, at your own rates, plus what actually drives the price of a concrete job beyond the ready-mix.

Open the calculator →

Paint Calculator

Paint quantities and cost for walls and ceilings separately, in gallons, with coats and coverage accounted for, plus what decides an interior or exterior painting price.

Open the calculator →

Drywall Calculator

Drywall sheets, framing, screws and insulation for a room, by sheet size and waste allowance, plus how drywall repair is priced and why it is not by the square foot.

Open the calculator →

Tile Calculator

Tiles, boxes and grout for a floor or wall, with the waste allowance that saves the second trip, plus what tile installation costs per square foot and why the rate is not one number.

Open the calculator →

Drywall Cost Calculator

Price a drywall job: board, compound, tape, screws, hanging and finishing labor, at your own rates, with the cost per square foot at the end.

Open the calculator →

CMU Block Calculator

Blocks, courses, mortar bags and reinforcement for a concrete block wall, with your own prices on top, plus what a block wall costs once the footing and the steel are counted.

Open the calculator →

Brick Calculator

Bricks and mortar for a wall, by brick size and joint thickness, plus what a brick wall costs to build once the footing, the bond and the access are priced.

Open the calculator →

Tile Cost Calculator

Price a tile job: tile, thinset, grout, trim, substrate prep and setting labor at your own rates, with the cost per square foot at the end.

Open the calculator →

Painting Cost Calculator

Price a painting job: paint, primer, preparation hours, trim, access and sundries at your own rates, interior or exterior, per square foot.

Open the calculator →

Drywall Repair Calculator

Price a drywall repair the way it is actually quoted: by repair type, hours, trips to the house and your minimum callout charge.

Open the calculator →

Drywall Mud Calculator

How much joint compound and tape a job takes, by finish level, converted into the boxes, pails and bags you actually buy.

Open the calculator →

Electrician Calculator

Wire length and cost for a circuit run, by conductor size and material, plus what decides the price of the job: open walls, the number of openings, and what the panel can take.

Open the calculator →
Use It on Your Own Site

Put This Calculator on Your Site

Free to embed, on any site, with no account and nothing to sign. Paste this where you want the tool to appear. It sizes itself to fit, and it keeps working whether or not the visitor ever clicks through to us.

Embed code
<iframe src="https://contractorgetonline.com/embed/calculators/concrete-cost"
        data-cgo-calculator
        title="Concrete Cost Calculator"
        loading="lazy"
        style="width:100%;min-height:900px;border:0"></iframe>
<p>Free <a href="https://contractorgetonline.com/calculators/concrete-cost">Concrete Cost Calculator</a> by Contractors Get Online</p>
<script src="https://contractorgetonline.com/embed.js" async></script>

The only thing we ask is that you leave the credit line under it. If you would rather link than embed, a plain link to the calculator page is just as welcome.